PHASE 1    February, 2018 - June, 2019

Capacity Building for Conformity Assessment Ability of ITE in ASEAN Member States


Proponent Country : Indonesia
Representative : Minister of Trade, Directorate of Standardization and Quality Control, Indonesia
Project Proponent : Ministry of Industry, Agency for Research and Development of Industry, Center for Materials and Technical Products (B4T), Indonesia
Implementing Agency : Japan Business Machine and Information System Industries Association (JBMIA)

Activity


1. Field Study

Date from July 3 to July 4, 2018

Place

Hanoi, Vietnam

Workshop Overview

Participants visited the new 10 meter EMC anechoic chamber built at Tan Long 2, Vietnam and learned the facility and technical know-how required for EMC testing of information technology equipment.

Achievements

・Feedback from workshop participants
・35 out of 36 participants' knowledge was improved from this workshop

2. Basic Workshops on EMC

Date from August 28 to August 31, 2018

Place 

Serpong, Indonesia

Workshop Overview

Through classroom lectures and onsite demonstrations, participants learned about international EMC standards such as CISPR 32, CISPR 35, IEC 61000-4-2, and IEC 61000-4-3.

Achievements

・25 invited engineers participated
・EMC technical capacity building : 52% up (objective; Comparison)

3. Advanced Technical Conference on Product Safety

Date from September 4 to September 7, 2018

Place

Yokohama, Tokyo, Japan

Workshop Overview

Participants learned about IEC 60950 and IEC 62368-1, the international standards for product safety, through classroom instruction and demonstrations of actual testing procedures.

Achievements

・14 invited engineers participated
・Safety capacity building : 46% up (objective; Questionnaire on the last day)

4. Basic Work Shop on Product Safety

Date from November 27 to November 30, 2018

Place 

Ho Chi Minh, Vietnam

Workshop Overview

Participants gained an understanding of Multifunctional Peripherals (MFPs) and the IEC 60950-1 international standard through classroom instruction, group discussions, and test demonstrations.

Achievements

・14 invited engineers participated
・Safety capacity building : 85% up

5. Advanced Technical conference on EMC

Date from December 4 to December 7, 2018

Place 

Hiratsuka, Japan

Workshop Overview

Participants learned about the latest trends in EMC international standards, methods for internal verification of measurement equipment and facilities, and how to create EMC test plans through classroom instruction, group discussions, and test demonstrations.

Achievements

・15 invited engineers participated
・EMC technical capacity building : 44.2% up

6. EMC Round Robin test

Purpose This round robin test is similar tothe proficiency test required by ISO/IEC 17025, comparing the results measured by participating laboratories against a standard reference source to determine whether they are similar or different from those of other laboratories by Z score.

Expected participating Laboratory

Laboratory operating 3m and/or 10m method EMC semi-anechoic chamber.

Nomination

Organization (7)

EEI(Thailand), BPPT, B4T, Baristand (Indonesia), SIRIM (Malaysia), QUATEST3 (Viet Nam), DOST-EPDC (Philippines)

Result

Measurements at all laboratories have been completed, but results from some laboratories deviated from the median. These results were notified to the participating laboratories.